V2 — Template 12 — Events & Conferences  ·  URL: /events/  ·  Design: Netceed editorial layout. Includes: filter strip on dark bg, featured event split card with inline booking form, event grid, meeting CTA, webinars, past recaps, email signup.  ·  ← Back to Index
Zone 1 — Page Header (.page-header dark navy, breadcrumb-pill, H1, lead paragraph)
Zone 2 — Filter Strip (dark navy sticky strip, white outlined pills, active = orange fill. URL state: ?type=tradeshow&status=upcoming)
Show:
Zone 3 — Featured Event (.featured-event-split — left dark panel with "FEATURED" badge, event details, right = inline booking form with honeypot)

Don't miss us at.

Zone 4 — Events Grid (.bg-light .grid.grid-3 of .event-grid-card with date, name, location, status badge (.tag-pill), link-arrow)

Find us on the road.

Our engineering and commercial team attends key industry events across North America year-round.

May
06
2026
Exhibiting
IEEE PES T&D Conference
📍 Anaheim, CA 📅 May 6–9, 2026

North America's leading power and energy conference. MPINarada in the battery storage pavilion with LFP UPS and BESS systems on display.

BESS Grid Storage LFP
Jun
03
2026
Exhibiting
Data Center World North America
📍 Austin, TX 📅 Jun 3–5, 2026

Premier data center infrastructure conference. We'll be showing the NESP Rack Series and discussing LFP transition roadmaps for UPS applications.

Data Center UPS BMS Demo LFP
Jun
24
2026
Attending
InterSolar / Energy Storage NA
📍 San Diego, CA 📅 Jun 24–26, 2026

Key solar and BESS event. No booth this year — attending as conference participants. Meetings can be arranged at the venue or nearby.

BESS Grid Storage
Sep
15
2026
Exhibiting
CTIA MWC Americas
📍 Las Vegas, NV 📅 Sep 15–17, 2026

Wireless and telecom industry's flagship North American event. MPINarada showing NEBS Level 3 qualified telecom reserve power solutions.

Telecom NEBS L3 VRLA Replacement
Oct
07
2026
Attending
AI Infrastructure Summit
📍 San Francisco, CA 📅 Oct 7–9, 2026

Focused on data center infrastructure for AI workloads. Attending to engage with AI hyperscaler procurement teams evaluating UPS chemistry transitions.

AI Data Center High Density UPS
Nov
12
2026
Virtual Webinar
LFP vs. VRLA: Technical Comparison for Telecom Engineers
🌎 Live + On-Demand ⌛ 60 min

Presented by MPINarada Applications Engineers. Register for live Q&A or watch the on-demand recording post-session. No gate, no form for the recording.

All Industries Technical Free
Server-side rendered — all events in initial HTML. Filter state reflected in URL: ?type=tradeshow&status=upcoming. No AJAX-only filtering. CMS or static list managed by marketing team. Events auto-archive 7 days after end date.
Zone 5 — Meeting Booking Strip (.cta-card dark rounded with link-arrow — "Schedule a meeting at [event]" standing offer)
Zone 6 — Webinars (.section bg-white, section-label "WEBINARS", upcoming .webinar-row with teal left border, on-demand .webinar-row with muted left border)

Learn from our engineers.

Free technical webinars hosted by MPINarada Applications Engineers. Live sessions include Q&A. Recordings available on-demand — no gate, no form.

Nov
12
Sizing LFP for High-Density AI Rack Environments
Presented by [Engineer Name], Applications Engineer · MPINarada

Topics covered: rack-level power budgeting, C-rate requirements for GPU load profiles, thermal derating curves at high ambient, BMS integration with PDU and EPO systems, and selecting LFP over VRLA for high-cycle partial state of charge operation.

Dec
04
VRLA Replacement in Telecom: What Engineers Get Wrong
Presented by [Engineer Name], Applications Engineer · MPINarada

Topics covered: cycle life comparison under partial-state-of-charge, float charging compatibility and charger reuse, temperature performance at -20°C vs. VRLA failure modes, NEBS Level 3 compliance path for LFP, and how to specify the right C-rate for reserve power applications.

Past
[Past Webinar Title — LFP BMS Integration with Third-Party UPS Inverters]
Presented by [Engineer Name] · October 2025 · [X] attendees

Covered: CAN bus protocol mapping, Modbus TCP register mapping for BMS-to-inverter communication, common integration pitfalls with specific inverter brands, and live demo of OMS® integration dashboard.

Past
[Past Webinar Title — Cell-Level Traceability for OEM Procurement]
Presented by [Engineer Name] · August 2025 · [X] attendees

Covered: Narada manufacturing documentation structure, batch traceability records, how to request factory audit access, what procurement teams should actually ask for (vs. what they typically ask for), and NDA process overview.

Webinar recordings are not gated. Transcripts and slides live in the Technical Library (Template 06). Webinar attendees imported into HubSpot within 48 hours tagged "webinar-[slug]". No gate on recordings — download friction kills reach.
Zone 7 — Past Event Recaps (3 .split-card items with .tag-pill "Past", title, key takeaway. Physical presence evidence.)

Recent event recaps.

Where MPINarada has been, the conversations we've had, and the problems we've helped solve.

Past Trade Show

[Show Name] · [Month YYYY]

48 booth meetings in 3 days: AI data center demand for LFP UPS systems is real and accelerating. Engineers arriving with specific GPU rack power requirements — not exploratory conversations.

Key takeaway: Hyperscaler procurement teams are now evaluating LFP for UPS at the cell specification level — cycle life, temperature data, and certification documentation are table stakes.

48 meetings · [City, State] Read recap
[Event booth photo — actual booth, not stock]
Past Telecom

[Show Name] · [Month YYYY]

What telecom engineers are actually asking about LFP cycle life — and why most published spec sheets don't answer the right question. Session recap from our technical presentation.

Key takeaway: The real question isn't "how many cycles" — it's "how many cycles at what depth of discharge under real partial-state-of-charge conditions." Most spec sheets only answer the first question.

[X] session attendees · [City, State] Read recap
[Presentation or booth photo — actual event, not stock]
Past BESS

[Show Name] · [Month YYYY]

BESS project pipeline conversations at [Show Name] — what grid-scale developers are actually specifying and where LFP fits vs. alternative chemistries in the current procurement environment.

Key takeaway: Grid-scale BESS procurement is moving toward cell-level traceability requirements. Narada's publicly traded status (SH:600884) is becoming a differentiator in procurement documentation packages.

Exhibiting · [City, State] Read recap
[Booth or show floor photo — actual event]
Recap posts live in /resources/blog/ or /resources/event-recaps/ — these cards link out. Photos required — stock photography of trade shows is NOT acceptable. Use actual booth photos. Recap posts carry Event schema markup.
Zone 8 — Email Signup (.cta-full-bleed dark "Stay updated on MPI events" with simple email input + button inline row)

Stay updated on MPI events.

We'll notify you when we confirm new trade show dates and open webinar registration. Technical content only — no marketing email cadence.

Distinct from general newsletter. Segment: "event-announcements". Send frequency: 1–2 per month max. Unsubscribe prominent in every email.

Email signup segment: "event-announcements" — separate from "newsletter" and "technical-updates" segments. No marketing cadence. Event-triggered sends only.
Zone 9 — Footer Band (.footer-band showing office locations) + .site-footer with .footer-wordmark